Armory Emergency Generator and Renewable MicroGrid Feasibility Study
As the architectural consultant, Hinge Studio worked closely with Prime Consultant P2S Engineers to explore microgrid renewable energy sources and…
As the architectural consultant, Hinge Studio worked closely with Prime Consultant P2S Engineers to explore microgrid renewable energy sources and…
This planning study undertook a review of the existing Seattle Animal Shelter Facility, their operations and their current needs. From…
This sweet timber frame cabin sits at the end of River Road in Plain, Washington. The orientation and layout of…
This approximately 2600sf ophthalmology clinic houses 4 exam rooms, 3 procedure rooms and an imaging room as well as associated…
Hinge Studio was selected by Washington State Parks to design a replacement comfort facility at the Fort Ebey State Park…
The project included assessing an existing 23,000 sf industrial building and 3.5 acre site for multiple uses. Hinge provided land…
Hinge Studio served as prime consultant and architect in evaluating the needs of Regional Animal Services of King County (RASKC)…
Hinge Studio is currently working with Washington State Parks to design a maintenance facility at St. Edward State Park. We…
Chihuly Garden and Glass approached Hinge Studio to solve a problem. The museum’s cafe was capturing daytime visitors but felt…
Hinge Studio worked with Sound 2 Summit to bring the spirit of this local brewery into their new space. The…